ARCHITECTS / RESOURCES

TECHNICAL LIBRARY

Files that help ask the right questions before the system, glazing and installation junction enter the final specification.

This is not a set of universal working drawings. Open checklists help collect inputs; working details, structural checks and DWG files are prepared for the actual wall, levels, system and loads.

DOWNLOADS / PDF

Three files to start with.

They can be completed in part and sent with a plan, elevation or photograph of a critical interface.

01

Architectural glazing project brief

Project stage, largest openings, requirements, adjacent trades and installation access.

Download PDF ↓
02

Insulating glass checklist

Orientation, build-up, safety, solar control, acoustics, mass and glass logistics.

Download PDF ↓
03

Installation junction checklist

Levels, supports, thermal envelope, membranes, waterproofing, drainage and concealed work.

Download PDF ↓

PROJECT DWG

DWG only when tied to a project.

We deliberately avoid presenting a generic DWG as a solution for every building. The same frame behaves differently against concrete, aerated block, external insulation, terrace build-up or ventilated façade.

Request a technical file / DWG ↗
01

Send the section

Show wall build-up, finished levels, façade and frame position.

02

Add the element

System, dimensions, glass mass and opening type.

03

Receive the question list

We identify missing information before a coordinated detail or DWG can be issued.

LINKS

Related resources

FAQ

Questions about technical files.

Can the PDFs be used as working drawings?

No. They are input and coordination checklists. A working detail must follow the actual building.

Does BIFORIUM provide DWG files?

Yes, once the system, wall, levels, loads and adjacent layers are understood. Files are issued within a specific project.

Can we start without a complete window schedule?

Yes. Plans, elevations, one section and the largest openings are often enough for an initial review.

DETAIL / START

Have one difficult junction?

Send it separately. There is no need to wait for the complete glazing schedule.

Send a junction for review ↗