WHAT A QUOTATION NEEDS
Perfect documentation is not required for an initial estimate. It is important, however, to separate confirmed information from assumptions that can change both cost and configuration.

Inputs for preliminary and detailed window, slider and façade pricing: drawings, dimensions, openings, glass, finish, levels and installation.
Start with a PDF
Plans, elevations and an opening schedule provide enough context for the first question round.
Mark the largest element
The largest sash, corner, façade module or low threshold should be checked first.
Include installation scope
The price of elements and the price of a completed junction are different. State what the request should include.