TECHNICAL DETAIL / BIFORIUM

DRAINAGE & WATER

Reliable glazing provides a controlled route for water to leave the assembly safely. System drainage, terrace and external discharge need to work together.

01 / FRAME
02 / THERMAL
03 / STRUCTURE
04 / WATER

DETAIL LOGIC

What should be resolved before installation.

Sealant is important, but it is not a substitute for drainage geometry. Where water can collect, there needs to be a physical exit route and access for maintenance.

CHECKPOINTS

We review the junction as a system.

01

Drainage openings

System outlets are kept clear of insulation, sealant and finishes.

02

External channel

A channel in front of a threshold works only with adequate discharge and cleaning access.

03

Membranes

Waterproofing is turned into the assembly so water cannot migrate behind the internal airtight line.

04

Backup scenario

At critical zones we consider where water goes during intense rain, blockage or surcharge of the external drainage system.

COORDINATION

Need a junction for a specific project?

Send the section, levels and wall build-up. We will identify missing inputs for a project-specific solution.

Send drawings ↗