TECHNICAL DETAIL / BIFORIUM

LOW HS THRESHOLD

A visually flush threshold looks simple, but below it the bearing base, thermal break, system drainage, waterproofing and finishes must all fit together.

01 / FRAME
02 / THERMAL
03 / STRUCTURE
04 / WATER

DETAIL LOGIC

What should be resolved before installation.

The common mistake is drawing the threshold separately from the terrace. Profile, channel, membranes and falls must be coordinated in one section.

CHECKPOINTS

We review the junction as a system.

01

Finished floor level

FFL is fixed before the frame is ordered so the threshold does not conflict with screed and finishes.

02

Bearing below frame

Heavy sliding systems need a rigid, stable base across the structural bearing zone.

03

System drainage

Internal drainage chambers require a free path to the exterior.

04

Terrace water management

External channels, falls and waterproofing are coordinated with the threshold as one system.