A base profile below the frame should do more than insulate. Its primary job is to transfer the unit weight reliably while limiting a severe thermal bridge.

01 / FRAME
02 / THERMAL
03 / STRUCTURE
04 / WATER

DETAIL LOGIC

What should be resolved before installation.

A warm-base brand name does not make a junction correct by itself. Load capacity, fixing compatibility, finished-floor height and continuous waterproofing all need to be resolved.

CHECKPOINTS

We review the junction as a system.

01

Strength

Material and geometry are checked against the actual weight of frame, moving panels and glazing.

02

Continuous bearing

Long and heavy systems need a level bearing plane without local settlement.

03

Thermal continuity

The warm base should connect logically with floor or wall insulation.

04

Waterproofing

Interfaces with membranes and external drainage are planned before finishes close the base.