TECHNICAL DETAIL / BIFORIUM

GLASS RAILING
BASE

In a frameless balustrade the most important part is barely visible. The base shoe, anchors and slab edge carry the horizontal load transferred by the glass.

01 / FRAME
02 / THERMAL
03 / STRUCTURE
04 / WATER

DETAIL LOGIC

What should be resolved before installation.

A fixing detail should not be copied from one project to another without checking the substrate. Height, pane width, slab type, edge distances and anchor strategy all change how the junction behaves.

CHECKPOINTS

We review the junction as a system.

01

Structural zone

Anchors must engage sufficient structural material rather than screed or facade finishes.

02

Slab edge

Edge distances and concrete condition are checked before a fixing scheme is selected.

03

Glass

Laminate build-up and thickness depend on geometry, height and design loads.

04

Water

Base profile, covers and waterproofing are coordinated so water does not remain around fixings.

COORDINATION

Need a junction for a specific project?

Send the section, levels and wall build-up. We will identify missing inputs for a project-specific solution.

Send drawings ↗